We have supplied a number of NHS Trusts and this latest project required the installation of ComAp products to provide this particular hospital with a high level of resilience from interruption of power. The two Low Voltage CAT generators are synchronise at 11kV and are switched to essential loads via a number of routes. The complete installation was fully commissioned including our ‘What if?’ test sequence to give the customer confidence in the fact that we had covered all eventualities.